McMaster Kinesiology Labs

Hamilton
Architects
dpai architecture inc.
Address
1280 Main St W, L8S 4L8 Hamilton
Year
2011
Cost
1M - 100M
Stories
Undisclosed

When the Department of Kinesiology needed to design facilities to house new biomechanics, physiology and motor-control labs using existing space in the Ivor Wynne Centre Building they turned to dpai. Short on time, but in need of a thorough assessment of the space, dpai led user groups through a participatory design process that was crafted specifically to facilitate the compressed schedule. With a scope of work that included all interior design and furniture selection, the end product is filled with light and transparency and a once hidden department was now front and centre.

Related Projects

  • Osaka University MACHIKANE Nursery school
    Coelacanth K&H Architects
  • Pool Pavilion
    Reddymade
  • Sanierung Geschäftshaus Aeschenvorstadt
    KREN Architektur
  • Armadale Residence
    Rob Mills Architecture & Interiors
  • New chalet
    Arttesa, designed & tailored

Magazine

Other Projects by dpai architecture inc.

King William Performing Arts District
Hamilton
Stanley Residence
Hamilton
The Seedworks Urban Offices
Hamilton
kg&a studio
Toronto
Brock University Plaza Building
St. Catharines
Harry Howell Twin Pad Arena
Waterdown